Change management on construction projects
Change management is a term that is used to refer to the preparation and support that is required in the process of organisational change.
It provides a structured approach to helping individuals, teams and entire organisations change their approach, attitude, position and responsibilities within an organisation. It can be appropriate to assist in the redirection or redefinition of; budget allocations, resource use, business process, and other modes of operation.
Organisations can go through periods of significant change during construction projects. There may be need to:
- Redefine business operations during the preparation of a project brief.
- Re-structure the business organisation.
- Move the location of the business, which can entail moving house, moving children to a new school, moving partners and so on.
- Develop a migration strategy to move from one building to another.
- Adopt new business practices.
These can be complicated and even traumatic changes for employees, and professional change management advice can be beneficial in ensuring that business operations are maintained and business objectives achieved.
In a construction, the term 'change management' can sometimes be used to refer to change control processes where changes to a project’s scope – which may have impacts on time, cost or quality – are assessed and approved. See Change control for more information.
[edit] Related articles on Designing Buildings
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.